SOME PROBLEMS OF ENGINEERING MECHANICS IN THREE GORGES PROJECT
-
摘要: 简要介绍了三峡水利枢纽工程概况,工程建设中主要技术难点,以及几个主要工程力学问题,包括流体力学、固体力学、二相流及爆破力学等问题.结合三峡工程侧重叙述岩石(体)力学应考虑的新问题.大型岩土工程是庞大的复杂系统,岩石力学涉及众多学科.建议应用系统工程的理论和方法研究岩石(体)力学,使其在国民经济中发挥更大作用,在岩石(体)力学研究中还需针对不同的目标、任务考虑各种非线性问题.因此,岩石(体)力学应与工程问题更紧密地结合.Abstract: This paper gives a brief account of the Three Gorges key water control project, the main technical difficulties in construction,as well as some important problems of engineering mechanics, including fluid mechanics,solid mechanics,two-phase flow and explosion mechanics etc. New problems of rock(rock masses)mechanics concerned with the Three Gorges Project are reviewed here,Geotechnical engineering in a large-scale is ahuge and complicated system and rock(rock masses)mechanics is related with avariety of dis...
-
Key words:
- Three Gorges Project /
- rock(rock masses)mechanics /
- system engineering